|

Our Dual Xeon servers
are part of a network that have high speed redundant
Internet connectivity as shown below:
-
Time Warner Gigabit
Link To Internet - 1000 Mbps Max
-
Five x Verio Gigabit
Links To Internet - 5 x 1000 Mbps Max
-
Cogent Gigabit Link
To Internet - 1000 Mbps Max
-
Two x Allegiance
GigE Links to Internet - 2 x 1000 Mbps Max
-
Williams GigE Link
to Internet - 1000 Mbps Max
-
Three x MFN GigE
Links To Internet - 3 x 1000 Mbps Max
-
Savvis OC3 Link
To Internet - 155Mbps Max
-
ELI DS3 Link To
Internet - 45Mbps Max.
This investment in quality
bandwidth affords us excellent network performance
with a high level of resilience. Our network is fully
switched, utilizing high specification components.
Replacements for all core equipment are kept on site
ensuring fast recovery in the event of equipment failure.

Server
hardware »
We use industrial strength web server equipment for
performance and reliability including P4 and Dual
Xeon 2.0+ GHz based systems. All servers have at least
2GHz processors, 100Mbit Ethernet adapters, a minimum
of 1GB of memory and a server grade mainboard and
chipset.

Power
System »
A dedicated electricity supply delivers both three
and single phase power to our site. Power is routed
through UPS devices and power conditioners before
being distributed to server racks through industrial
strength 16 Amp outlets.

Operating
System »
Our
UNIX-based machines are predominately Linux based
currently running Red Hat Fedora Core 2 OS
Our Software »
Development
Languages/Environments
GCC (C, C++, Objc, GCJ) 3.3.3
Perl 5.8.0
PHP 4.3.11 (with Plesk installed)
PHP 4.2.2 (without Plesk installed)

|